Project Archive

 Project Name County File  Document Name
2015 - 2020 Consolidated Plan for the use of CDBG, HOME, and ESG Funds    Project Page 
Bay View Residential Project (2009) SD04-8809 Draft EIR
Buena Vista Wind Energy Project (2005) LP02-2005 Final EIR
Bulk Material Processing Center & Related Activities at the West Contra Costa Sanitary Landfill LP92-2054 LP02-2026 Draft and Final EIR
Cannabis Regulation and Licensing   Link to Project webpage 
Clayton Regency Mobile Home Park   Link to Project Webpage
Creekside Memorial Park Cemetery   Final EIR
Draft EIR  Appendices
El Sobrante P-1 Rezoning   Link to Project Webpage
Housing Element 2014    Link to Project Webpage
Keller Canyon Landfill LP08-2026
LP89-2020 
Link to Project Webpage
Local Area Pipeline Network Project (2011)   Final EIR
Meteorological Tower Ordinance   ZT12-0003 Link to Project Webpage
Newport Pointe   Recirculated Mitigated Negative Declaration
Recirculated Public Notice
Proposed Architectural Rendering
Biological Assessment 
Pantages Bay GP99-0008
R04-3146
SD06-9010
DP04-3062 
Final EIR
Draft EIR
Appendices
Notice of Extended Review
Project webpage
Pittsburg-Bay Point BART Station Area Specific Plan    Final EIR (PDF - large file)
Recirculated DRAFT EIR (PDF - large file)
Saranap Village Mixed Use Project (2014)
GP13-0003
RZ13-3224
SD13-9359
DP13-3035 

Final EIR
Recirculated Draft EIR
Recirculated Draft EIR Appendices
Draft Environmental Impact Report (DEIR)
DEIR Appendices A-f (Notice of Preparation, Air Quality Technical Reports, Special-status Species and Biology Technical Reports, Greenhouse Gas Technical Reports, Hydrology Technical Reports, Noise Technical Reports)
DEIR Appendix G (Transportation and Traffic Technical Reports)
Cultural Resources Reports
Geological Reports
Hazardous Material Reports
Utilities Reports

Shell Crude Tank Replacement 
(large documents - may take a long time to load)
  Draft EIR
Final EIR
Sufism Reoriented  LP08-2034
MS09-0008
Draft EIR
Final EIR - Volume I
Final EIR - Volume II
Appendices
Table of Revision to Draft EIR in the Final EIR
Letter of Community Support
Support Letters
Opposed Letters
Staff Report
Tres Vaqueros Wind Farm Project (2011) LP09-2005 Draft EIR  Appendices
Final EIR
 Urban Limit Line Review   Link to Project Webpage 
Vasco Winds Repowering (2011)   Draft EIR
Final EIR  Appendices
Wireless Telecommunications Facilities Ordinance  Ordinance No 2016-11  Application Requirements for Wireless Facility Applications
Wireless Facility in County Right of Way Application
Background information (CEQA, etc)